Kittilä Gold Mine, AEF Main Level 900 (2018-)2018-09-28T11:37:00+00:00

Project Description

Kittilä Gold Mine, AEF Main Level 900 (2018-)

Client: Agnico Eagle Finland Oy
Extent: 75 000 m³ theoretical excavation volume, 2000 m length
Responsibilities: Principal, architectural, structural, and rock engineering design as well as geological services and HVACE design

Watch Video