Paloheinäntunneli, Mass Transit Tunnel (2011-2015)2018-07-05T09:43:30+00:00

Project Description

Paloheinäntunneli, Mass Transit Tunnel (2011-2015)

Client: HKR-Rakennuttaja
Extent: 115 000 m³ excavation volume, 1146 m length
Responsibilities: Overall design responsibility – principal, architectural, rock engineering, and structural design as well as fire, HVACE, geotechnical, landscape design, road and traffic design and fire engineering design

Watch Video