Construction of the Sulkavuori Central Wastewater Treatment Plant began in 2018 and is expected to be commissioned in 2024. The Sulkavuori Central Wastewater Treatment Plant will be excavated in rock to create stale conditions for the operation of the treatment plant, so that treatment processes are not disturbed or slowed down due to weather variations.

The planned Central Wastewater Treatment Plant uses the latest treatment technologies in order to keep the discharge load on the lake to a minimum. The activated sludge process is supplemented by sand filtration and UV disinfection. The treated wastewater is led to Lake Pyhäjärvi by means of a tunnel excavated in the bedrock and a discharge pipe.

The progress of the excavation of the Sulkavuori Central Wastewater Treatment Plant can be monitored through the environmental monitoring system, EMO (Environmental Monitoring Online), developed by Kalliotekniikka Consulting Engineers Oy.

In the design of the Sulkavuori Central Wastewater Treatment Plant, special attention has been paid to a possible future expansion.

Client
Tampere Region Central Wastewater Treatment Plant Ltd. / City of Tampere

Responsibilities
General plan review and rock mechanics and tunneling design

Related References

West Metro

Länsimetro Oy

With the West Metro extension, the Helsinki metro network will reach Espoo, increase in length by 21 kilometers and see 13 new stations constructed along its run.

Vuosaari Transportation Tunnels

Tiehallinto/ Vuoli-projekti

Rockplan designed Vuosaari Harbor’s Porvarinlahti road tunnels and Labbacka railway tunnel in cooperation with Finnmap Infra Oy. The 1,600-meter-long submarine road tunnel in Vuosaari is approximately 25 meters below sea level at its deepest point.

Viikinmäki Wastewater Treatment Plant

Helsingin vesi (now Helsinki Region Environmental Services Authority HSY)

The Viikinmäki rock treatment plant, which was built mainly inside the rock, was put into operation in 1994. The treatment plant’s process is based on the activated sludge method.