Stockholm Metro – Blue Line Extension to Nacka

Stockholm metro’s blue line is being extended from Kungsträdgården, with new terminals at Nacka and Sockeplan. The track length of the extension is 11 kilometers, along which 5 new metro stations will be built. Rockplan’s responsibilities in the project include rock mechanical design and engineering geology at Nacka and Sockenplan, as well as engineering geological reports from Gullmarsplan, Sofia, Hammarby Canal and Sickla.

Construction of the blue line extension began in 2019 and the metro is intended to reach Nacka and Sockeplan by 2030.

Client
Sweco Civil AB

Responsibilities
Rock mechanics and tunneling design and engineering geology

Related References

South-Hermanni Underground Parking Facility

Helsingin kaupungin asuntotuotantotoimisto ATT

The South-Hermanni parking facility serves residential and commercial properties in the area. There are 336 parking spaces, as well as five stairwells and four elevators to the surface level.

Vuosaari Transportation Tunnels

Tiehallinto/ Vuoli-projekti

Rockplan designed Vuosaari Harbor’s Porvarinlahti road tunnels and Labbacka railway tunnel in cooperation with Finnmap Infra Oy. The 1,600-meter-long submarine road tunnel in Vuosaari is approximately 25 meters below sea level at its deepest point.

Paloheinä Public Transportation Tunnel

HKR-Rakennuttaja

The Paloheinä tunnel is a traffic tunnel running underneath Helsinki Central Park for more than a kilometer. Rather than a new bus line passing through the park, it was decided to run it through a tunnel under the park and preserve the recreational uses on the surface. Currently, the tunnel is only used by public bus transportion, but the design has also accounted for possible future tram traffic.