Stockholm metro’s blue line is being extended from Kungsträdgården, with new terminals at Nacka and Sockeplan. The track length of the extension is 11 kilometers, along which 5 new metro stations will be built. Rockplan’s responsibilities in the project include rock mechanical design and engineering geology at Nacka and Sockenplan, as well as engineering geological reports from Gullmarsplan, Sofia, Hammarby Canal and Sickla.
Construction of the blue line extension began in 2019 and the metro is intended to reach Nacka and Sockeplan by 2030.