ONKALO® Research Facility

The underground ONKALO® research facility, which extends to a depth of 450 meters, provides valuable information on the suitability of the Olkiluoto bedrock for final disposal. The bedrock is studied geologically, hydrogeologically and geochemically, among other things. The site is excavated using the traditional drill-blasting method. Research, surveys and monitoring of conditions can be conducted from ONKALO® without disturbing the construction of the disposal facility.

Inside, ONKALO® looks like this!

ONKALO® is a registered trademark of Posiva Oy

Client
Posiva Oy

Responsibilities
Rock mechanics and tunneling design, implementation planning and work-time planning

Related References

Stockholm Metro – Blue Line Extension to Nacka

Sweco Civil AB

Stockholm metro’s blue line is being extended from Kungsträdgården, with new terminals at Nacka and Sockeplan. The track length of the extension is 11 kilometers, along which 5 new metro stations will be built.

South-Hermanni Underground Parking Facility

Helsingin kaupungin asuntotuotantotoimisto ATT

The South-Hermanni parking facility serves residential and commercial properties in the area. There are 336 parking spaces, as well as five stairwells and four elevators to the surface level.

Vuosaari Transportation Tunnels

Tiehallinto/ Vuoli-projekti

Rockplan designed Vuosaari Harbor’s Porvarinlahti road tunnels and Labbacka railway tunnel in cooperation with Finnmap Infra Oy. The 1,600-meter-long submarine road tunnel in Vuosaari is approximately 25 meters below sea level at its deepest point.