The design of the maintenance level of the Kittilä gold mine is currently the deepest ongoing project at Rockplan. The new maintenance level, to be excavated and built into the rock, will be located at a depth of 900 meters. The maintenance level will provide warehouse space and social facilities for personnel. In the future, this may be the location of the deepest workplace cafeteria in Lapland!
Stockholm Metro – Blue Line Extension to Nacka
Sweco Civil AB
Stockholm metro’s blue line is being extended from Kungsträdgården, with new terminals at Nacka and Sockeplan. The track length of the extension is 11 kilometers, along which 5 new metro stations will be built.