Kittilä Mine Main Level 900

The design of the maintenance level of the Kittilä gold mine is currently the deepest ongoing project at Rockplan. The new maintenance level, to be excavated and built into the rock, will be located at a depth of 900 meters. The maintenance level will provide warehouse space and social facilities for personnel. In the future, this may be the location of the deepest workplace cafeteria in Lapland!

Client
Agnico Eagle Finland Oy


Responsibilities

Principal design, architectural, rock mechanics and tunneling, and structural design

Related References

West Metro

Länsimetro Oy

With the West Metro extension, the Helsinki metro network will reach Espoo, increase in length by 21 kilometers and see 13 new stations constructed along its run.

Stockholm Metro – Blue Line Extension to Nacka

Sweco Civil AB

Stockholm metro’s blue line is being extended from Kungsträdgården, with new terminals at Nacka and Sockeplan. The track length of the extension is 11 kilometers, along which 5 new metro stations will be built.

South-Hermanni Underground Parking Facility

Helsingin kaupungin asuntotuotantotoimisto ATT

The South-Hermanni parking facility serves residential and commercial properties in the area. There are 336 parking spaces, as well as five stairwells and four elevators to the surface level.

Interested?

For more information please contact Vesa-Matti Lehtovaara
+358 45 657 8336
vesa-matti.lehtovaara@rockplan.fi