Kittilä Mine Main Level 900

The design of the maintenance level of the Kittilä gold mine is currently the deepest ongoing project at Rockplan. The new maintenance level, to be excavated and built into the rock, will be located at a depth of 900 meters. The maintenance level will provide warehouse space and social facilities for personnel. In the future, this may be the location of the deepest workplace cafeteria in Lapland!

Client
Agnico Eagle Finland Oy


Responsibilities

Principal design, architectural, rock mechanics and tunneling, and structural design

Related References

Stockholm Metro – Blue Line Extension to Nacka

Sweco Civil AB

Stockholm metro’s blue line is being extended from Kungsträdgården, with new terminals at Nacka and Sockeplan. The track length of the extension is 11 kilometers, along which 5 new metro stations will be built.

South-Hermanni Underground Parking Facility

Helsingin kaupungin asuntotuotantotoimisto ATT

The South-Hermanni parking facility serves residential and commercial properties in the area. There are 336 parking spaces, as well as five stairwells and four elevators to the surface level.

Vuosaari Transportation Tunnels

Tiehallinto/ Vuoli-projekti

Rockplan designed Vuosaari Harbor’s Porvarinlahti road tunnels and Labbacka railway tunnel in cooperation with Finnmap Infra Oy. The 1,600-meter-long submarine road tunnel in Vuosaari is approximately 25 meters below sea level at its deepest point.

Interested?

For more information please contact Vesa-Matti Lehtovaara
+358 45 657 8336
vesa-matti.lehtovaara@rockplan.fi